Overview
We supported the team from planning through execution of repair and restoration of headrace pipe ferrules . The work involved close coordination with site teams and to maintain schedule and quality while keeping interfaces simple and transparent.
Key Facts
- Client: Arun Kabeli Power Limited
- Project: Kabeli B1 Hydropower Project
- Capacity: 25 MW
- Location: Panchthar and Taplejung Districts
Scope of Work
- Dewatering works of Pipe
- Cutting, and edge preparation of damaged pipe ferrules
- Welding and erection of the pipe ferrules
Quality, Safety & Documentation
- Dimensional checks; NDT as applicable
- Risk assessment on the headrace pipe aligment
Outcomes
The project achieved a swift repair works for damaged headrace pipe. Work execution was smooth streamlined with the schedule