Overview
We supported the team from planning through execution of fabrication of penstock ferrules . The work involved close coordination with site teams and design teams and to maintain schedule and quality while keeping interfaces simple and transparent.
Key Facts
- Client: Kabeli Energy Ltd.
- Project: Kabeli A Hydropower Project
- Capacity: 37.6 MW
- Location: Panchthar and Taplejung Districts
- Contractor: BRSD Engineering Pvt. Ltd.
Scope of Work
- Design review & constructability inputs
- Shop fabrication and QA documentation
- On-site installation assistance and quick repair
- Construction of Workshop and yard
Quality, Safety & Documentation
- Material traceability and MTC management
- Dimensional checks; NDT as applicable (UT/RT/DPT/MPT); hydro/air tests on request
- ITP/WPS/PQR adherence and inspection records
Outcomes
The project achieved a swift fabrication works for penstock installation. Work execution was smooth streamlined with the project schedule