Kabeli A Hydropower Project (37.6 MW) – Hydro Mechanical Works

Fabrication of pipe ferrules and heavy plate works, including on-site advisory

Overview

We supported the team from planning through execution of fabrication of penstock ferrules . The work involved close coordination with site teams and design teams and to maintain schedule and quality while keeping interfaces simple and transparent.

Key Facts

  • Client: Kabeli Energy Ltd.
  • Project: Kabeli A Hydropower Project
  • Capacity: 37.6 MW
  • Location: Panchthar and Taplejung Districts
  • Contractor: BRSD Engineering Pvt. Ltd.

Scope of Work

  • Design review & constructability inputs
  • Shop fabrication and QA documentation
  • On-site installation assistance and quick repair
  • Construction of Workshop and yard

Quality, Safety & Documentation

  • Material traceability and MTC management
  • Dimensional checks; NDT as applicable (UT/RT/DPT/MPT); hydro/air tests on request
  • ITP/WPS/PQR adherence and inspection records

Outcomes

The project achieved a swift fabrication works for penstock installation. Work execution was smooth streamlined with the project schedule