Overview
We supported the client to fulfill the requirement of preparation of feasibility report for capacity upgradation of the project as per the DoED standard.
Key Facts
- Client: Mandu Hydropower Limited
- Project: Bagmati Small Hydropower Project
- Capacity: 32 MW
Scope of Work
- Review of data, information from field surveys and investigations, analysis of the data,
- Design and preparation of a report
- Preparation of drawings
Quality, Safety & Documentation
- Updated Feasibility Study Report (22MW+10MW)
- Drawings and Cost Estimation for Upgradation
- Hydrology Study using DHM data for discharge verification.
- Civil, Hydromechanical, Electromechanical and Transmission Line optimization of existing
- structures to accomodate upgradatio
Outcomes
The project achieved an DoED standard Updated Feasibility Study Report-32MW with clear document control and traceability. The project report got approval from DoED on 25 April 2025.