Bagmati Small Hydropower Project (22 MW) – Plate Supply and Third Party Inspection

End-to-end plate supply from Steel Authority of India Limited (SAIL), India for hydropower components (ASTM 537 CL 1 series and equivalent), logistics and documentation.

Overview

We supported the client from planning through execution with a practical, documentation-first approach. The work involved close coordination with design teams and vendors to maintain schedule and quality while keeping interfaces simple and transparent.

Key Facts

  • Client: Mandu Hydropower Limited
  • Project: Bagmati Small Hydropower Project
  • Capacity: 22 MW

Scope of Work

  • Material supply and vendor coordination as required
  • Supply of ASTM 537 CL 1 steel plates of 28mm and 24mm thickness.
  • Approx. 250 MT of plates supplied in total
  • Third Party Inspection Arrangement for Quality Inspection at SAIL factory

Quality, Safety & Documentation

  • Material traceability and MTC management
  • Dimensional checks as per ASTM A20
  • ASTM A578 Level B standard testing
  • EN 10204 : 3.2 adherence and inspection records
  • Handover packs with Mill Test Certification and Custom Declatration Forms

Outcomes

The project achieved a reliable support with clear document control and traceability. ISteel Plates supply and delivery went smooth whitout hampering the project schedule. The project started generation of 4 August 2025

← Back to projects