Overview
We supported the client from planning through execution with a practical, documentation-first approach. The work involved close coordination with design teams and vendors to maintain schedule and quality while keeping interfaces simple and transparent.
Key Facts
- Client: Mandu Hydropower Limited
- Project: Bagmati Small Hydropower Project
- Capacity: 22 MW
Scope of Work
- Material supply and vendor coordination as required
- Supply of ASTM 537 CL 1 steel plates of 28mm and 24mm thickness.
- Approx. 250 MT of plates supplied in total
- Third Party Inspection Arrangement for Quality Inspection at SAIL factory
Quality, Safety & Documentation
- Material traceability and MTC management
- Dimensional checks as per ASTM A20
- ASTM A578 Level B standard testing
- EN 10204 : 3.2 adherence and inspection records
- Handover packs with Mill Test Certification and Custom Declatration Forms
Outcomes
The project achieved a reliable support with clear document control and traceability. ISteel Plates supply and delivery went smooth whitout hampering the project schedule. The project started generation of 4 August 2025